Econoburn EBWC-500 Spezifikationen

Stöbern Sie online oder laden Sie Spezifikationen nach Warmwasserbereiter & Kessel Econoburn EBWC-500 herunter. Econoburn EBWC-500 Specifications Benutzerhandbuch

  • Herunterladen
  • Zu meinen Handbüchern hinzufügen
  • Drucken

Inhaltsverzeichnis

Seite 1 - OPERATING MANUAL

GASIFICATION BOILERSEBW ANDEBWC SERIESHIGH EFFICIENCYWOOD FIRED BOILERSC USINSTALLATION ANDOPERATING MANUAL

Seite 2 - GASIFICATION BOILERS

BOILERS CONNECTED TO AN ExISTING SYSTEMi. Shall be installed without interfering with the normal delivery of heated water from the originalboiler.i

Seite 3

OPERATE THE (GAS, OIL, ELECTRIC) BOILER PERIODICALLY TO EN-SURE THAT IT WILL OPERATE SATISFACTORILY WHEN NEEDED.DO NOT RELOCATE OR BYPASS ANY OF THE S

Seite 4 - ERATION OF THE BOILER

FLUE PIPE AND CHIMNEY The Boiler must be located as close as possible to the chimney. It should be ducted so that there is a minimum number of elbows

Seite 5 - SPECIFICATIONS

CLEARANCES The ECONOBURN™ Wood-Fired Boiler is to be installed in accordance with the National Building Code or local regulations. Allowances front a

Seite 6 - BOILER DIAGRAM

DURING A POWER FAILURE NEVER REFUEL THE BOILER.GRAVITY LOOP (NO POWER)A normally open zone valve must be installed to allow a free ow of water in a p

Seite 7 - LOCATING THE BOILER

FREE STANDING INSTALLATION In the freestanding, or stand-alone system, the ECONOBURN™ boiler is the sole source of cen-tral heating. In this system co

Seite 8 - COMBUSTION AIR SUPPLY

13BOILER WIRING DIAGRAM FOREWB-100 EWB-500 EWB-1000Figure 3

Seite 9 - WARNING - RISK OF FIRE

14BOILER WIRING DIAGRAM FOREWB-150 EWB-200 EWB-300Figure 4

Seite 10

15Figure 5

Seite 11

16Figure 6

Seite 12 - THE CHIMNEY

Manufactured by: Alternative Fuel Boilers LLCA Division of Dunkirk Metal Products Inc.2 Central AvenuePO Box 689Brocton, New York 14716Phone: 716-792-

Seite 13 - Figure 1

INSTALLERS FINAL CHECKLIST PIPING INSPECTION 1. Boiler plumbed properly?2. Is a new expansion tank or equivalent installed?3. Normally closed by-pass

Seite 14 - PLUMBING CONNECTIONS DIAGRAM

SECTION 2 – OPERATING INSTRUCTIONSINITIAL STARTUPTo remove any remaining moisture in the refractory, a small to medium re should be main-tained for 1

Seite 15 - TIONAL AND LOCAL CODES

19CREOSOTE AND CLEANING1. Establish a routine for the storage of fuel, care of the appliance, and ring techniques.2. Check daily for creosote build

Seite 16 - EWB-100 EWB-500 EWB-1000

FLUE DRAFT CONTROL OPERATIONThe purpose of the Flue Draft Control (Fig. 6) is to prevent ames from coming out of the re door to-ward the operator. T

Seite 17 - EWB-150 EWB-200 EWB-300

DRAFT FAN CONTROL UNITThe Control Panel (Fig.10) includeds an LED Primary Limit Controller which is set at the tempera-ture desired for the temperatur

Seite 18 - Figure 5

The Thermo Overload switch protects the Control Panel from any electrical shorts or power surges in excess of 5 amps with any external electrical devi

Seite 19 - Figure 6

BOILER OPERATING CHECKLISTa. Keep area around ECONOBURN™ boiler clean and clear of combustibles.b. Use only wood. DO NOT burn any other combustibl

Seite 20 - FLUE PIPE INSPECTION

SECTION 3 - MAINTENANCE AND CLEANING The ECONOBURN™ Wood-Fired Boiler must be cleaned regularly to maintain top efciency. A good practice is to esta

Seite 21 - AUTOMATIC STOKER

ASH DISPOSAL Before removing ashes, cease refueling and allow the re to die down. Before opening the Ash Pit door, ensure the re in the boiler is co

Seite 22 - CREOSOTE AND CLEANING

CHIMNEY MAINTENANCEInspect monthly during heating season. For extra safety, have your chimney inspected by an ac-credited professional yearly, prior t

Seite 23

TABLE OF CONTENTSINTRODUCTION 1SPECIFICATIONS 2BOILER DIAGRAM 3SECTION 1 - INSTALLATION INSTRUCTIONSINTRODUCTION TO INSTALLERS 4APPLICABLE STANDAR

Seite 24 - DRAFT FAN CONTROL UNIT

SECTION 4 - ECONOBURN™ BOILER WARRANTYWARRANTY PERIODThe warranty period for the main boiler is 5 years against defects in workmanship. Any purchased

Seite 27 - Figure 12

INTRODUCTION Congratulations on the purchase of your new ECONOBURN™ Wood-Fired Boiler. Developed in the northeastern United States, the ECONOBURN™ Boi

Seite 28

SPECIFICATIONSECONOBURN™ Specications (subject to change without notice) Boiler Model EBW-100 EBW-150 EBW-200 EBW-300 EBWC-500 EBWC-1000Depth 47

Seite 29 - TROUBLESHOOTING GUIDE

BOILER DIAGRAM3SupplyControl PanelTurbulator AgitationLeverFirebox DoorDraft Fan CoverFlue Draft HandleReturn(Lower back panel)Gasication Chamberand

Seite 30

SECTION 1 - INSTALLATION INSTRUCTIONS (Save these Instructions!) INTRODUCTION TO INSTALLERS Before installing this ECONOBURN™ Wood-Fired Boil

Seite 31

With the location of the boiler selected the next step is to position the unit and proceed with as-sembly. If a noncombustible base is not required EC

Seite 32 - Rev. 4 9/2009

OUTSIDE COMBUSTION AIR MAY BE NECESSARY IF:1. Fans that are installed in the fuel storage area create negative pressures in the room where the solid

Kommentare zu diesen Handbüchern

Keine Kommentare